The production line is used for KKL/MLB evaporator product assembly, with 2 operators
Assembly process:
OP10 Installed firewall (KKL/MLB);
OP20 Installation pipe support plate/Installation O-ring (KKL/MLB);
OP30 Install the expansion valve and tighten the expansion valve bolt (KKL/MLB);
OP40 helium leak detection (KKL/MLB);
OP50 labeling, testing (KKL/MLB);
OP60 final inspection, offline (KKL/MLB);
Beat efficiency: ≤25s